CarpaSilicon | Investment Opportunity | 2030–2035

An investment thesis for European silicon metal.

CarpaSilicon is developing a Romanian silicon metal concept for European industry. The aim is to turn a supply opportunity into a competitive industrial project through staged validation of the market, energy solution and technology.

Independent initiative · Pre-feasibility · Public information, not an investment offer.

Investment thesis

Why silicon, why Romania, why now.

CarpaSilicon pursues a diversified product strategy for Europe’s aluminium and chemical industries. Aluminium Grade and Chemical Grade are investigated in parallel as equal target markets from early development, assessing requirements, commercial attractiveness and technical feasibility. This lets feedstock selection, furnace design and refining be aligned with an economically attractive product mix.

Deliverable grades and the product mix will be defined and validated against customer requirements, feedstock chemistry, the furnace and refining concept, OEM validation and customer qualification, in dialogue with potential customers and technology partners. Neither grade nor a price premium is guaranteed. Chemical Grade is not Semiconductor Grade; semiconductor quality is not promised.

Romania combines an energy system under structured transformation with industrial know-how and EU market access. Whether this translates into a competitive project depends on validated power, feedstock and customer conditions, which the development gates are designed to test.

Why CarpaSilicon? Why now?

Three structural reasons to start development work today.

Industrial silicon projects take years to move from first studies to qualified product. The reasons below explain why early development work is relevant now. They do not imply a guaranteed commissioning date.

01 · Supply security

Europe imports significant silicon volumes

Eurostat data reproduced in Commission Implementing Regulation (EU) 2025/2351 show 334,861 tonnes of silicon imported into the EU in 2024. This is an import figure, not total demand and not an import-dependency percentage.

Regulation (EU) 2025/2351
02 · Romanian energy

An energy system in transformation, 2025–2035

Romania's Energy Strategy 2025–2035 (horizon 2050) was approved by HG 1491/2024. CarpaSilicon is investigating firm and renewable supply options within that context; no supply, price or availability is secured.

HG 1491/2024
03 · European integration

Silicon metal is a CRMA strategic raw material

Regulation (EU) 2024/1252 lists silicon metal as a strategic raw material. That status applies to the material, not to this project: CarpaSilicon is not an approved Strategic Project.

Regulation (EU) 2024/1252

Customer qualification, power structuring, permitting and financing each run on multi-year timelines. Starting the evidence work now is what keeps a 2030–2035 horizon realistic to assess.

Value levers

What would decide the economics.

The first five levers drive the core business. Microsilica and heat count only after validation.

  1. 01Delivered electricity cost

    The dominant cost driver, including grid and balancing.

  2. 02Specific consumption

    MWh per tonne achieved in practice.

  3. 03Yield

    Silicon recovered from quartz and carbon inputs.

  4. 04Quality

    Consistent chemistry and sizing that customers qualify.

  5. 05Sales

    Qualified customers and contract structure.

  6. 06Microsilica

    By-product value only after validation.

  7. 07Heat recovery

    Value only after technical and economic validation.

Illustrative arithmetic

Why the electricity price matters so much.

32,000 t/y × 12.3 MWh/t × ±10 EUR/MWh
= ±3,936,000 EUR/year (≈ ±3.94 m)

Purely illustrative, not project engineering assumptions. It shows a gross electricity cost movement only, not returns, EBITDA or all-in OPEX.

Success conditions

What has to be true.

  • Customers confirm specifications and a qualification route.
  • Quartz and reductants pass testing at suitable quality.
  • A bankable, competitive power structure is achievable.
  • A site with grid access and a clear permitting path is secured.
  • An independent engineering review supports the concept.
  • Financing is structured for a final investment decision.

Risks & mitigation

Named risks, concrete responses.

RiskMitigation
Electricity price and availabilityAssess firm and renewable structures before any capital commitment.
Feedstock qualityTest quartz and reductants early; keep alternative sources.
Customer qualificationBuild specifications with buyers from the first gate.
Permitting and grid timelinesStart site and grid screening in parallel, not sequentially.
Market price cyclesTest the concept against price scenarios before FID.
Execution and start-upIndependent engineering review and experienced contractors.

Strategic horizon

2030–2035

A strategic horizon for assessing a first phase, not a contractual or scheduled commissioning date. Timing depends on every gate being passed.

Development roadmap

Five gates. Each one must be passed, not assumed.

All gates below are forward-looking. None has been completed.

Current status: Pre-feasibility: requirements, sources and options are being structured.

  1. Gate 1Customer & feedstock validation

    Specifications, qualification routes and raw-material tests.

  2. Gate 2Technical concept & power

    Independent engineering review and power-supply structure.

  3. Gate 3Site & permitting

    Site selection, grid connection and environmental permitting.

  4. Gate 4Financing & FID

    Funding structure and final investment decision.

  5. Gate 5Execution & qualification

    Construction, start-up and customer product qualification.

Staged investor engagement

Engage in steps, with information matched to each stage.

  1. 01Introduction

    Read the brief and share your focus and stage preference.

  2. 02Confidentiality

    Detailed information only after an agreement is signed.

  3. 03Gate-linked review

    Discuss participation linked to specific development gates.

Opens your email app. Please share no confidential information before an agreement.